Description: <DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>300-foot buffer on the river side of the levee centerline, representing the Levee Critical zone, in which any construction or changes requires approval from the Corps of Engineers. Generated using the Buffer function in ArcMap. </SPAN></P></DIV></DIV></DIV>
Description: <DIV STYLE="text-align:Left;"><DIV><DIV><P><SPAN>500-foot buffer on the land side of the levee centerline, representing the Levee Critical zone, in which any construction or changes requires approval from the Corps of Engineers. Generated using the Buffer function in ArcMap. </SPAN></P></DIV></DIV></DIV>